Milestone 3 Overview

Milestone 3 designs the user interface for the functionality you designed in Milestone 2. You have a backend design for arbitrary ingredients; now you decide what a user actually sees and does.

You will work from scenarios to concept designs to wire frames, and then build the static pages — the layout and form elements, with placeholder data and no dynamic behavior yet. The pages you build this week are the ones you will make dynamic and connection to the REST API in Milestone 5.

The same use cases as Milestone 2, from the other side of the API.

   
Start H Sep 10
Team deliverables due M Sep 14 @ 11:45 pm
Individual deliverables due W Sep 16 @ 5:00 pm
Retrospective due W Sep 16 @ 11:45 pm

Set Up Your Technical Documents

Your frontend design goes in the same technical-documents/ folder as the requirements and the backend design.

Download frontend-design.md and save it as technical-documents/frontend-design.md in your team repository. It is a template: it has the headings each use case section needs, and those headings are what your design is reviewed against. Follow the same process you would for any other file — issue, branch, pull request.

Wire frames and any other images go in technical-documents/images/, the same folder you created in Milestone 2. Export them from your wire framing tool as PNGs and commit them; do not host images anywhere else and link to them. If your wire framing tool has a text based output, you’re encourage to include those

Expectations

Each team member is expected to:

Deliverables and Rubric

Team Technical Deliverables (10 points)

Complete the Frontend Design Workshop with your team. As in Milestone 2, the workshop gets you started; it does not get you to a complete solution.

Working in your team repository, for UC5 and UC7:

  • Design — a section in technical-documents/frontend-design.md for each use case, containing two scenarios, a concept design for each scenario, an annotated wire frame with its flow/navigation map, a design explanation, and any requirements assumptions.
  • Static pages — the components in coffee_maker_frontend/src/components/ that implement those wire frames, with realistic placeholder data, routes added to App.jsx (if needed), and menu entries added to HeaderComponent.jsx (if needed). Merged to main with no regression in current functionality.

You will also produce technical-documents/build-notes-m3.md, the record of your team’s build-with-AI activity: what you asked for, where the generated markup drifted from your wire frame, and what you kept.

Independent Technical Deliverables (10 points)

Your individual tasks include:

  • Create a branch in your individual repository and bring over your team’s work — the technical-documents/ updates and the static pages. Merge into development and then into main.
  • Add sections to technical-documents/frontend-design.md for UC2 Add Recipe and UC4 Edit Recipe, with the same contents required of the team: two scenarios each, concept designs, annotated wire frames, design explanations, and assumptions.
  • Build the static pages for UC2 and UC4, with routes and menu entries, merged to main.
  • Complete the AI Frontend Review Activity, which produces technical-documents/design-inspection-m3.md.

Your design has to be consistent with your team’s. A recipe form that treats ingredients differently than the inventory page does is a finding during the design inspection, not a style choice.

Technical Process (5 points)

You are expected to follow good process, for design documents and for code:

  • Issues created for each major task, with owners and descriptions, and tied to commits where there are commits. Close them as you finish.
  • Work done on branches off development, merged via pull request, and then merged to main for evaluation. You can approve your own pull requests in your individual repository.
  • Wire frames committed to technical-documents/images/.

Team Collaboration (10 points)

You are expected to contribute to your team’s design and implementation. That means we want to see that everyone worked on the milestone, including both technical and non-technical work — commits from each team member, pull request approvals from each team member, and document editing by each team member. The contributions need to be meaningful, and we are looking for roughly equal effort.

Note that the point value has increased for this milestone. By now you should have an established working relationship with your team, and everyone should be contributing. A lack of contribution starts having a larger impact on your individual grade here.

What could equal collaboration look like for Milestone 3?

  • Technical Deliverables
    • Each team member owns a use case, or a scenario within one
    • Each team member builds at least one static page
    • Every team member reviews someone else’s wire frame before it is merged
  • Project Management
    • Each team member edits the project management documents (at least once) to show completion of their task(s)

If you worked together on a task, note that in your task list. Be ready to discuss it at your check-in next week.

Project Management (5 points)

Update your team’s project management documents:

  • Record your Milestone 3 tasks, owners, and deadlines in project-management/tasks-m3.md, and mark them off as they are completed.
  • Revise your team’s communication and AI policies in project-management/index.md if your retrospective surfaced something that needs to change. Milestone 3 is the first milestone where AI generates code that ships, so check that your AI policy says what your team wants to happen there — who reviews it, and what gets recorded.

Retrospective (5 points)

Complete retros/retro-m3.md in your individual repository. See the Retrospective overview for what is expected.

In addition to the usual reflection, Milestone 3 asks you one specific question:

Where did your design change between the wire frame and the static page, and why?

Something always changes once you build it. What matters is whether the change was a decision or a drift, and whether the wire frame got updated to match.

Due at W Sep 16 @ 11:45 pm, after your individual deliverable.