Updated for Fall 2026
Milestone 5 Overview
Milestone 5 builds the frontend you designed in Milestone 3 and connects it to the backend you built in Milestone 4. The static pages become working pages: real data, real requests, real responses.
This is where the system becomes a system. Up to now the frontend and the backend have been developed against documents; this milestone is the first time they have to agree with each other, and the places where they don’t are the interesting part.
- Your team implements the frontend of UC2 Add Recipe, UC4 Edit Recipe, UC5 Update Inventory, and UC7 Add Ingredients.
- You individually implement the frontend of UC6 Order Beverage.
Implementation and testing take longer than design. Plan accordingly.
| Start | H Sep 24 |
| Team deliverables due | M Oct 5 @ 11:45 pm |
| Individual deliverables due | W Oct 7 @ 5:00 pm |
| Retrospective due | W Oct 7 @ 11:45 pm |
Expectations
Each team member is expected to:
- [Individual] Contribute to team work
- [Team] Complete the Frontend Workshop with your team
- [Team] Select a unified frontend design for UC2 and UC4 from your individual Milestone 3 designs
- [Team] Implement and test the frontend of UC2, UC4, UC5, and UC7, including the team AI integration activity
- [Individual] Integrate the team’s work and implement and test the frontend of UC6
- [Individual] Complete the AI Failure Mode Activity — find out what your interface does when things go wrong
- [Individual] Complete your Milestone 5 retrospective
- [Team & Individual] Follow the CSC 326 GitHub Processes
Deliverables and Rubric
Team Technical Deliverables (15 points)
- Complete the Frontend Workshop. This is exploratory and stays on its own branch — it is not merged.
- Complete the design selection, recorded in
technical-documents/design-selection-m5.md. - Implement and test the frontend of UC2, UC4, UC5, and UC7, meeting the Done Criteria.
- Complete the AI integration activity, recorded in
technical-documents/code-review-m5.md.
Design changes made during implementation go in the Implementation Decisions section of technical-documents/frontend-design.md, and the wire frames get updated to match what you built. Frontend system tests go in technical-documents/system-tests.md — at least two per use case, eight in total, executed through the browser with actual results recorded.
Independent Technical Deliverables (15 points)
- Integrate your team’s implementation into your individual repository, using appropriate branching and merging.
- Implement and test the frontend of UC6 Order Beverage, meeting the Done Criteria. At least two frontend system tests for UC6 in
technical-documents/system-tests.md, executed through the browser, and no regression in the team’s functionality. - Complete the AI Failure Mode Activity, recorded in
technical-documents/failure-modes-m5.md. - Write
technical-documents/frontend-design-reflection.md: reflect on your team and individual frontend designs and implementations, what changed during implementation, and how the team’s design of UC2, UC4, UC5, and UC7 shaped your implementation of UC6.
Technical Process (20 points)
You are expected to follow the CSC 326 GitHub Processes and ensure the following:
- At least 60% line coverage and 50% branch coverage in
coffee_maker. The frontend has no automated test suite; it is verified by the system tests you execute in the browser, so the backend coverage you reached in Milestone 4 must not regress. npm run lintpasses incoffee_maker_frontend- Work completed in a branch, one per feature, with an owner
- Pull requests used consistently to merge into
developmentand thenmain(the workshop branch is the exception and is never merged) - A team member other than the author reviews and merges each pull request
- All delivered code merged into
main - Design changes recorded in
technical-documents/frontend-design.md
Team Collaboration (15 points)
You are expected to contribute to your team’s implementation. That means we want to see that everyone worked on the milestone, including both technical and non-technical work — commits from each team member, pull request approvals from each team member, and document editing by each team member. The contributions need to be meaningful, and we are looking for roughly equal effort.
If you worked together on a task, note that in your task list. Be ready to discuss it at your check-in next week.
Project Management (5 points)
Update your team’s project management documents:
- Record your Milestone 5 tasks, owners, and deadlines in
project-management/tasks-m5.md, and mark them off as they are completed. - Revise your team’s communication and AI policies in
project-management/index.mdif your retrospective surfaced something that needs to change.
Retrospective (5 points)
Complete retros/retro-m5.md in your individual repository. See the Retrospective overview for what is expected.
In addition to the usual reflection, Milestone 5 asks you one specific question:
Which failure mode surprised you, and why hadn’t you thought of it?
Due at W Oct 7 @ 11:45 pm, after your individual deliverable.
