Updated for Fall 2026
Milestone 6 Overview
Milestone 6 delivers and presents the CoffeeMaker system. Coming into this milestone, the team and individual implementations should be 99% done. Milestone 6 closes the last gaps, makes sure the documents describe the system you actually built, and shows the work to the teaching staff.
Your work on the Onboarding project will be evaluated by what the system does and by how well you can explain it.
- Your team delivers the complete team implementation of UC2, UC4, UC5, and UC7.
- You individually deliver the complete system, including UC6 Order Beverage, and record a presentation of your own contribution.
This is a short milestone. Do not plan on writing new features.
| Start | H October 8 |
| Team deliverables due | F Oct 9 @ 11:45 pm |
| Individual deliverables due | S Oct 10 @ 5:00 pm |
| Retrospective due | S Oct 10 @ 11:45 pm |
Expectations
Each team member is expected to:
- [Individual] Contribute to team work
- [Team] Ensure the team repo meets the Done Criteria for UC2, UC4, UC5, and UC7 on the
mainbranch. - [Team] Complete the acceptance rehearsal before the team deadline
- [Individual] Ensure your individual repo meets the Done Criteria for all use cases, including UC6, on the
mainbranch. - [Individual] Complete the AI Documentation Alignment Activity
- [Individual] Record and submit your individual presentation
- [Individual] Complete your Milestone 6 retrospective
- [Team & Individual] Follow the CSC 326 GitHub Processes
Using AI in Milestone 6
The course policy defers to each milestone for what AI may be used for. For Milestone 6:
- Code and tests — AI may help you fix defects and close coverage gaps, under your team’s AI policy, as in Milestones 4 and 5.
- Finding problems — AI may be used to propose acceptance scenarios and to point out where your technical documents and your code disagree. That is what the two AI activities this week are for. Treat everything it reports as a hypothesis until you have checked it.
- Technical documents — the requirements, design documents, system tests, and design reflections are edited by you. AI may tell you a document is wrong; it may not rewrite it.
- Individual presentation — the narration and the explanation of your code are your own words. You may not use AI to generate the narration, a voice, or the video. If AI helped with the work you are presenting, say so in the presentation.
Deliverables and Rubric
Team Technical Deliverables (30 points)
- UC2, UC4, UC5, and UC7 meet the Done Criteria on the
mainbranch of the team repository. The teaching staff will evaluate your implementation by running tests ourselves after delivery. technical-documents/requirements.md,backend-design.md,frontend-design.md, andsystem-tests.mddescribe the system as built, including the API endpoint documentation. These documents should be updated to reflect the system as delivered.- Complete the acceptance rehearsal, recorded in
technical-documents/acceptance-rehearsal-m6.md.
Independent Technical Deliverables (30 points)
- Integrate your team’s final implementation into your individual repository, using appropriate branching and merging.
- UC2, UC4, UC5, UC6, and UC7 meet the Done Criteria on the
mainbranch of your individual repository. - Complete the AI Documentation Alignment Activity, recorded in
technical-documents/doc-alignment-m6.md. - Submit your individual presentation to Moodle.
Technical Process (5 points)
You are expected to follow the CSC 326 GitHub Processes and ensure the following:
- At least 60% line coverage and 50% branch coverage in
coffee_maker npm run lintpasses incoffee_maker_frontend- Work completed in a branch, one per fix or feature, with an owner
- Pull requests used consistently to merge into
developmentand thenmain(workshop branches are the exception and are never merged) - A team member other than the author reviews and merges each pull request in the team repository
- All delivered code merged into
main - Documentation corrections made through the same issue, branch, and pull request process as code
Team Collaboration (15 points)
You are expected to contribute to your team’s final delivery. That means we want to see that everyone worked on the milestone, including both technical and non-technical work — commits from each team member, pull request approvals from each team member, and document editing by each team member. The contributions need to be meaningful, and we are looking for roughly equal effort.
If you worked together on a task, note that in your task list.
Project Management (5 points)
Update your team’s project management documents:
- Record your Milestone 6 tasks, owners, and deadlines in
project-management/tasks-m6.md, and mark them off as they are completed. The acceptance rehearsal, which includes writing or prompting for scenarios, running them, and fixing the defects they find, counts as tasks and belongs on the list.
Retrospective (5 points)
Complete retros/retro-m6.md in your individual repository. See the Retrospective overview for what is expected.
In addition to the usual reflection, Milestone 6 asks you one specific question:
Where did your documents disagree with your system, and which one (documents or system) was wrong?
Due at S Oct 10 @ 11:45 pm, after your individual deliverable.
