Iteration 0 represents the start up iteration in the Team Project. During Iteration 0, you will participate in team building activities, plan your project, and draft the requirements associated with the customer’s enhancements, maintenance, and configuration requests.
Deadlines
- Start Date: H Oct 15
- Deadline: W Oct 21 @ 11:45 pm
Tasks
Iteration 0 consists of the following Tasks:
Technical Deliverables
- Preview Project Materials (before lab)
- Requirements
- System Test Plan
Technical Processes
Project Management
- Project Management Plan
- Team Check-in with Manager (in lab on H Oct 15)
Team Collaboration
- Team Forming (in lab on H Oct 15)
- Contribution to Iteration 0
- Weekly Teaming Reflection
Peer Review
- CoffeeMaker Inspection (in lab)
Delivering Iteration 0 Work
Everything you deliver in Iteration 0 is delivered the same way as code: on a branch, through pull requests. This is the first use of the project management branch and technical document branch processes you will follow for the rest of the Team Project. Iteration 0 uses these branches:
| Branch | What goes on it |
|---|---|
project-management or project-management-i0 |
project-management/: team goals, ground rules, AI policy, the project management plan, and tasks-i0.md |
docs-i0-investigation |
technical-documents/coffeemaker-investigation.md |
docs-i0-requirements |
technical-documents/requirements/ and technical-documents/system-tests.md, including the actual results of running the tests against the base system |
| your CoffeeMaker integration branch | the CoffeeMaker code and tests (see GitHub Setup) |
For each branch:
- Create the branch from
development, with an issue for it, and record it in the plan’s Branches and Owners table. For project management, decide now whether your team will use oneproject-managementbranch for the whole project or one branch per iteration part, and record that choice in your Ground Rules. - Every team member commits their own contributions. Each of you should have commits that show your contribution to the documents, and each of you adds your own row to the Approval tables in the ground rules and AI policy in your own commit. Reference the issue in each commit message.
- Deliver by pull request: from the branch to
development, reviewed by a teammate, and then fromdevelopmenttomain, both before the Iteration 0 deadline. What is onmainat the deadline is what is graded.
Do not delete a branch after it merges; its commit history is how the teaching staff see each member’s contribution.
Technical Deliverables
Preview Project Materials
Before your lab, preview the Team Project materials. The Team Project Main page provides the Project Perspective, an overview of Feature-based Roles, the Project Outline, and the Grade Categories.
As you work on the project, you will be expected to follow good software engineering processes while collaborating on a team. The pages on process and collaboration outline the expectations for the Team Project.
Bring any questions that you have about the Team Project with you to lab.
Requirements
You have been provided a set of problem statements from users of WolfCafe with enhancement, maintenance, and configuration requests. You will create a requirements document that supplements the requirements from the current version of CoffeeMaker. Additionally, you’ll use the personas you started exploring in class to further develop your requirements.
Timeframe
- Iteration 0 Deadline - W Oct 21 @ 11:45 pm
Audience
Your requirements document is intended to be an operational document (e.g., a system specification) for your team and a record of the requirements you will implement for management.
Activity
You must complete your requirements document in your team repository, starting from the template in technical-documents/requirements/index.md. Work on the docs-i0-requirements branch, as described in Delivering Iteration 0 Work. The Requirements document must have the following subsections, which the template already contains.
Introduction: Overview of the requirements document and new or modified requirements or tasks.
Glossary: Define any terms and user roles here. You may use definitions from earlier homeworks. You need to provide enough information so that your document can stand alone.
Personas: List your personas.
Functional Requirements: Model your functional requirements as use cases (each enhancement should map to one or more use cases). Each use case should adhere to the correct template.
Additionally, all functional requirements should include logging information to track things that happen in the system. For each major CRUD operation, there should be a log of the user, their role, and the action. The base WolfCafe project implements this logging with its AuditLogger; see technical-documents/design/security.md in your repository.
Give each use case its own page in technical-documents/requirements/use-cases/, copied from uc-template.md, and link it from the Requirements page. This will simplify some of the details (sequence and class diagrams) you’ll be adding as part of the project iterations.
It is possible that existing requirements from CoffeeMaker, should you choose to use them, will require modification. Any use cases that are modified should be listed with their modifications. Any modified text should be highlighted (in red, bold, or italic text). Include any new or changed logging information associated with the requirement.
Non-Functional Requirements: Any requirements that are not related to system functionality, like performance. You can model these as traditional statements in a numbered list.
Constraints: Constraints on development from the customer or from the existing projects. You can model these as traditional statements in a numbered list.
Questions: If you have questions about the scope of the requirements, please ask the teaching staff. The problem statement was left intentionally ambiguous to allow for teams to interpret in their own way, so it’s likely the teaching staff’s feedback will be “that sounds reasonable”. Record the questions and answers in the Questions section of the template.
Collaboration
This is a team activity. All team members are expected to contribute to the requirements document. This contribution should be shown through commits to the requirements pages, or notes in commit messages about who contributed.
Evaluation
You will be evaluated on the quality of your requirements.
System Test Plan
As part of writing your team’s requirements, you will create acceptance tests. These acceptance tests should be turned into system tests.
The system test plan is a record of your system and acceptance tests in document format (using the standard closed box test plan format). Management expects at least 3 system tests per updated or new use case.
System tests are run by hand through the browser, and you record the actual results each time you run them. By planning tests now, you can start thinking about what the front end of your system looks like and better understand the requirements.
Timeframe
- Iteration 0 Deadline - W Oct 21 @ 11:45 pm
Audience
Your system test plan is intended to be an operational document for your team and a record of your the system tests to determine if you have successfully implemented the requirements.
Create at least 3 system tests per updated or new use case in technical-documents/system-tests.md, starting from the template in your repository. The system test plan goes on the same docs-i0-requirements branch as the requirements, since the tests come from the requirements and change with them. Your test plan should include the following information:
- Testing Overview: Provide a summary about how to run the system for system testing.
- Test Data Summary: Provide a summary of data that should exist in the system before a test can be run.
- Test Plan: The test plan should include:
- Test ID: a unique name for the test
- Test Description: preconditions for starting the test and numbered specific steps, including specific input, for running the test
- Expected Results: description of what the user should expect to see or have displayed while executing the test. These should reference the numbers from the Test Description to indicate after which step each result is indeed expected.
- Actual Results: record the actual results of execution on the current system (it is ok if most or all tests fail at this point)
Collaboration
This is a team deliverable. All team members are responsible for the content even if portions of the work are completed individually. All team members should review and provide feedback. Team contributions should be shown through commits to the system test plan, or notes in commit messages about who contributed.
Evaluation Rubric
You will be evaluated on the quality of your test plan.
Technical Processes
GitHub Setup
You have been assigned a new repository for your team in GitHub. It contains the base WolfCafe project and the templates for your technical documents and project management plan. A GitHub Actions build runs on every push; your main branch should always stay green.
You should also create your feature-based role branches that will be merged into development for each feature. When the development build is green and you’re ready to deliver to main, complete a pull request from development to main. That means all changes funnel through the development branch first. The full branching, pull request, and issue process is also in technical-documents/github-process.md in your repository.
Timeframe
Iteration 0 - start during lab and finalize by Iteration 0 deadline for your lab
Audience
The use of the development branch is operational for your team. The management team expects that a development branch and feature-based role branches will be used.
Setting Up WolfCafe
WolfCafe is set up the same way as CoffeeMaker, and the repository’s README.md has a quick start for the backend and the frontend. A few things are different:
- Database settings. The backend runs against a local MySQL as
rootwith no password and creates thewolfcafeandwolfcafe_testschemas itself. If your MySQL is set up differently, copywolf-cafe-backend/.env.templatetowolf-cafe-backend/.envand edit it. Do not editapplication.properties; it is committed, so your settings would be pushed to the whole team. - Frontend settings. The frontend expects the backend at
http://localhost:8080and runs athttp://localhost:3000. To point it elsewhere, createwolf-cafe-frontend/.env.localwith aVITE_API_BASE_URLsetting. - The admin user. On its first start, the backend creates the user roles and a default admin with username
adminand passwordadmin. To use a different password, setADMIN_PASSWORDinwolf-cafe-backend/.envbefore the first start; it is only read when the admin is created. - Starting over. Drop the
wolfcafedatabase and restart the backend. It recreates the roles and the admin user.
See technical-documents/design/security.md for how users, roles, and logins work, and how to try the API in Postman.
Activity
To set up your system for development:
- Each team member sets up WolfCafe as described above and confirms the backend and frontend run and they can log in as
admin - Create a
developmentbranch of WolfCafe - Create a branch for integrating in the CoffeeMaker functionality
- Integrate in CoffeeMaker and associated tests
- Ensure everything builds, and that all three GitHub Actions checks on your branch pass (Build backend, Lint frontend, and Quality)
- PR to
developmentandmain - The rest of the team should clone the repo and create feature-based role branches
Collaboration
This is a team activity.
Evaluation
You MUST have your development and feature-based role branches for functionality planned for the first iteration created by the end of Iteration 0.
Project Management
Project Management Plan
This project spans almost 6 weeks of CSC 326. To be successful with the project, you and your team need to create a plan for completing the project. This project cannot be completed in a few days. You have to work steadily throughout the six weeks to accomplish the project goals.
Timeframe
- Iteration 0 Deadline - W Oct 21 @ 11:45 pm
Audience
The project management plan is operational for your team. You will use it to discuss your progress with management.
Activity
Complete the Project Management Plan in project-management/index.md in your team repository, and deliver it as described in Delivering Iteration 0 Work. The template has a section for each of the following:
Introduction
Goals & Benefits: What are the goals of the enhancements, maintenance, and configuration issues that you’re expected to complete for the project? What would a finished solution look like? What are the benefits to the solution?
Feature-based Roles
Discuss how you will break into feature-based subteams for the project. Identify who will on each sub-team and how subteams may change between Iteration 1 and 2 so that team members can gain experience in various roles.
As part of this discussion, you may want to identify a team leader and sub-team leaders.
Record the topic branches you foresee and who owns each in the plan’s Branches and Owners table.
Process Plan
Outline how your team will follow the required processes and any team-specific processes.
Development Plan
You will deliver completed requirements across several iterations.
With your team, read through the project outline and identify the tasks that you will need to complete as part of the Team Project. Create issues for each task.
Starting with Iteration 1, each subteam must deliver at least one use case corresponding to the problem statement by the end of each iteration. You can continue working on optional requirements until the final delivery. The teaching staff will expect to see a completed use case ready to demo during each Team Checkin. Formal acceptance testing by the teaching staff will be done at the end of the project, so you can continue to polish and fix identified bugs in a previously completed problem statement/use case.
Iteration Tasks
From your problem statement and use cases, you will create individual tasks to organize your work. Each task should be recorded in a corresponding GitHub Issue and tracked in the task sheet for its iteration in project-management/: tasks-i0.md, tasks-i1a.md, tasks-i1b.md, tasks-i2a.md, tasks-i2b.md, and tasks-final.md. Start with tasks-i0.md for the Iteration 0 work on this page. You should break down the project into tasks that are small enough that they can be assigned to one person and realistically be completed in a single day. Most design, testing, and development tasks should be assigned to a single person.
Provide an estimate, in person-hours, for how long you think it will take a member (or members) of your team to complete the task. If you plan to have multiple team members work on a task, make sure that the person-hours represent the work of each. As you complete the tasks, provide the actual time to complete the task. This will help you make better estimates in the future and let the teaching staff see the effort you put into the project. Use the Comments column to note changes or difficulties.
For example:
| Task | Issue # | Owner | Status | Estimated Person Hours | Actual Person Hours | Comments |
|---|---|---|---|---|---|---|
| Create order API endpoints | #14 | unityid1 | Acceptance | 3 | 2 | API tests passing, but not merged yet |
| Create customer order page | #3 | unityid2 | Delivered | 5 | 3 | Completed faster than expected |
| Create staff order list page | #4 | unityid2 | In Progress | 5 | 6 | Ran into issues retrieving orders from the API |
At the end of each iteration, you will review the status of each task in that iteration’s task sheet. The status values are defined in the plan:
- None = Loaded into iteration, but not worked on yet.
- In Progress = Actively coding.
- Acceptance = Unit tests and system tests associated with story pass.
- Delivered = In Main Branch after acceptance testing.
Any task not delivered at the end of the iteration should be copied over to the next iteration’s task sheet (typically called rolling over).
Kanban board
You may also model your plan visually on a GitHub Projects Kanban board, for extra credit. You still need to keep the task sheets for grading; your Kanban board should provide a parallel view of what you’re working on.
Collaboration
This is a team activity.
Evaluation Rubric
You will be evaluated on creating an initial plan with appropriate tasks and updating the plan with actual time and with any necessary adjustments to reflect what actually happened during the week.
Team Check-in with Manager
We understand that for Iteration 0, you may not have all of these tasks done before you meet with your manager (aka - your Lab TA). But these are things that you should be thinking about with your team during lab and making plans to complete for Iteration 0.
Each week you will spend some time checking in with your manager to give a team update during lab. Make sure that you check in with your manager in lab each week!
Timeframe
Iteration 0 - complete during lab
Audience
You will report your team progress to your manager.
Activity
Check in with your manager to discuss your progress. Use your development plan to drive your discussion.
You should discuss the following with your manager:
- Team Forming
- Team Goals
- Team Ground Rules
- Team AI Policy
- Inspection Notes
- Your draft project management plan
- Created issues
- An overview of the requirements your team plans to implement
- An overview of your system test plan
- Your GitHub setup (or planned setup)
- Your tasks for the upcoming week and who is assigned to each task
Collaboration
This is a team activity.
Evaluation
Your manager will provide feedback on your plan and give you feedback on where you stand. There may be deductions if you are too far off from your plan each week.
Team Collaboration
Team Forming
When starting a project, it is important for teams to come up with common goals and ground rules, including how the team will use AI. These goals, ground rules, and AI policy should be documented as part of the project’s documentation.
During lab on H Oct 15, you will start the team forming process.
Timeframe
- Iteration 0 Deadline - W Oct 21 @ 11:45 pm
Audience
Your common goals and ground rules will be operational for your team. Additionally, these goals/rules should be visible my management to help facilitate any team issues over the team project.
Activity
You will complete this activity as part of lab at the start of the team project. The activity will be lead by the lab TAs. You may need to complete the activity outside of lab by formally recording your common goals, ground rules, and AI policy in your team repository, while also ensuring that all team members agree to them.
There are three deliverables, each with a template in your repository’s project-management/ folder: Team Goals, Ground Rules, and a Team AI Policy. Deliver them as described in Delivering Iteration 0 Work.
Team Goals
Identify one or two team goals for the team project. Document them in project-management/team-goals.md.
Ground Rules
Document ground rules for your team in project-management/ground-rules.md. Consider the following questions when creating your Ground Rules. Team members are expected to individually indicate their approval of the Ground Rules by adding their own row to the page’s Approval table, in their own commit. As part of this, you will need to establish how your team will communicate (GroupMe, Discord, Slack) and be prepared to show it to your TA in lab. Email as the only communication mechanism is insufficient.
Team Procedures
- Team meeting times
- Communication mediums and frequency
- Decision-making - who decides and do roles play a part?
- Agendas for meetings
- Record keeping
- Branching structure, naming conventions, and ownership - discuss how you will handle your branching structure, naming conventions for branches, and branch ownership within the expectations outlined in the Technical Processes - GitHub Setup section. Include whether you will use one project management branch or one per iteration part (see Project Management Branches). Also decide where REST API design changes will go and how you will organize your system tests so feature branches can update them without colliding (see Technical Document Branches).
Work Quality
- Project Standards - what are the standards of quality for the team for code, tests, documentation, bug reports, and other deliverables?
- Strategies - how will you ensure quality? Pair programming, inspection, peer-review, or something else?
- Process Standards - how will your team adhere to required processes? Do you want to use other processes? If so, document those processes.
Team Participation
- Cooperation and equal distribution of tasks
- Inclusiveness
- Keeping on task
- Leadership and roles
Accountability
- What level of attendance and participation is expected for a team member?
- What level of responsibility is expected for a team member?
- What level of communication is expected for a team member?
- What level of commitment is expected for a team member?
- What actions should a team member take if they are unable to fulfill their commitments for a given week (or longer)?
Consequences for Non-Participation
- How will the team handle initial incidents of non-participation?
- How will the team handle multiple incidents of non-participation?
- What type of point infractions should extended non-participation incur? (The teaching staff will use this section of the document as a basis for grade modifications if they become necessary.)
Team AI Policy
The Team Project AI rules set the limits for every team. Within those limits, your team decides how it will actually use AI. Teams that never discuss it discover the disagreement during a code review the night before a deadline. Document your policy in project-management/ai-policy.md. As with the Ground Rules, team members are expected to individually indicate their approval by adding their own row to the page’s Approval table, in their own commit.
Each of you finished the Onboarding Project with a retrospective on what you would do differently with AI on the Team Project. Bring that answer to the team forming discussion. Your teammates used AI differently than you did, and the policy should come out of what all of you actually learned, not out of whoever has the strongest opinion.
At minimum, your policy must cover:
- Use for code and tests — where does your team want AI involved? Generating test cases, scaffolding a component, explaining unfamiliar code, and writing production logic are very different decisions. Say which are in and which are out.
- Review expectations — how does AI-generated code get reviewed before it merges? The Team Project rules require that the person who prompted is not the only reviewer. What else does your team require?
- Acknowledgment — how does your team mark AI-assisted work so it is visible? Pick one mechanism — a note in the pull request description, a commit trailer, or a code comment — so it is consistent and someone can actually check it. This is how your team discloses AI use.
- What “verified” means — before AI-assisted code is merged, what has the author actually done? Run it, read it line by line, written a test that fails without it? Set the bar explicitly, because “it looked right” is the default otherwise.
Also worth deciding:
- Technical documents — AI may review your requirements, design, and guides but not write them. How will your team use that review, and who decides which suggestions to take?
- Accommodating opting out — any student may choose not to use AI tooling. If a teammate opts out, how does your team divide work so that choice does not turn into an unequal contribution?
- Contribution and peer evaluation — if a large share of someone’s output is AI-generated, how does your team count that as a meaningful contribution? You evaluate each other twice during this project, so agree on this before the first evaluation rather than after.
- Time-boxing — how long does someone iterate on a prompt before writing the thing themselves?
- Sharing what works — will you keep a shared list of prompts that produced good results?
Your AI policy is a living document. Revisit it at your team check-ins, and update it when something is not working.
Collaboration
This is a team activity. The entire team is expected to participate and contribute.
Evaluation
You will be evaluated on coming to a common set of goals, outlining team ground rules that cover expectations on work quality, team participation, and accountability, and writing a Team AI Policy that covers the required topics. There will be a deduction if the goals, ground rules, or AI policy are not in their project-management/ pages but in some other format (e.g., a PDF linked from the repository), or if a team member’s approval is not in their own commit.
Team Collaboration
Contribution
All team members are expected to contribute to Iteration 0 of the assignment. Make sure that you record your contribution through commits to the repository, participation in the development processes, and collaboration on the technical and project management documents. If you work with a team mate on a pair programming or review activity, please note the collaboration in GitHub.
As a member of a team, you are responsible for all team deliverables. That means you should review your teammate’s work because your name is on the submission too!
Missing contributions will lead to deductions. Overwriting or rejecting team member contributions without constructive feedback and suggestions may also lead to a deduction by impeding another’s contribution.
During lab time you are expected to be present and collaborating with your team or, if working individually, you should be working on tasks associated with CSC 326.
During lecture, you will have the opportunity to sit with your team and have a team scrum. You are expected to check in with your team during this time.
Your contributions will be assessed through analysis of your team’s GitHub repository and feedback from teammates!
Weekly Teaming Reflection
Each week, you will be asked to complete a weekly teaming reflection. These will be emailed out via Qualtrics and will be due as stated in the weekly emails. The TAs will use these to help with discussions about contribution and collaboration during the team meetings. You will receive credit for completing them with good faith effort each week (please don’t rush through them).
Peer Review
CoffeeMaker Inspection
Get started with the project by taking some time to determine which individual implementation of CoffeeMaker to use as your base project. You should inspect each team member’s CoffeeMaker project to determine the one to move forward with. You’ll create a report of your findings and notes about areas of the system that will be important for your implementation in the Team Project.
Timeframe
Lab on H Oct 15. Due at the end of Iteration 0 - W Oct 21 @ 11:45 pm.
Audience
The audience is your manager to demonstrate how you investigated the system and the parts of the system that will be useful to you for your implementation.
Activity
Complete technical-documents/coffeemaker-investigation.md in your team repository, starting from the template, on the docs-i0-investigation branch (Delivering Iteration 0 Work), and record 1) what parts of the system you investigated and 2) your notes/results from those investigations. The template has a section for each task below.
Do the following tasks:
- Launch CoffeeMaker
- Run system tests. Note any challenges or issues that you run into or any information in the acceptance scenarios that would be useful as you craft your new requirements.
- Review functionality associated with the current CoffeeMaker requirements. Make notes on paths to pages that will be of interest and information that you might need to run a manual test.
- Review the frontend pages used for these UCs and identify key portions of the code that you may need to use, refactor, and/or can utilize as an example for your implementation.
- Review the REST API end points for the code that you trace and identify those that you may need to use, refactor, and/or utilize as an example for your implementation. Compare them with the endpoints WolfCafe already has, documented in
technical-documents/design/rest-api.md. - Review the backend code that you trace and identify classes that you may need to use, refactor, and/or utilize as an example for your implementation.
- Think about the user roles that are in WolfCafe and determine which page(s) should be associated with each role.
Collaboration
This is a team activity. The entire team is expected to participate and contribute.
Evaluation
You will be evaluated on the information provided in your review that demonstrates that you investigated the full CoffeeMaker system and started planning given the problem statement.