Updated for Fall 2026
The final project delivery involves a presentation and demo in lab, delivering the final bonus material, and updating the project management plan and other technical documents.
Deadlines
- Deadline: S Nov 21 @ 11:45 pm
Tasks
The Final Project consists of the following Tasks:
Technical Deliverables
Technical Processes
- Follow Technical Processes
Project Management
Team Collaboration
- Contribution to Final Product
- Peer Evaluation (due M Nov 23 @ 11:45 pm)
Technical Deliverables
In-Lab Presentation and Demo
As you wrap up Iteration 2, you will present an overview of your project updates, including a live demo, during lab.
Timeframe
Team Demo Deadline
- Team Demo: H Nov 19 during lab
Audience
You are presenting to a technical audience of your peers, management, and (hopefully) executive management!
Activity
All team members will create a presentation that includes the following items:
- Introduction of your team and project
- A description of your team’s process
- An overview of each team member’s contribution
- A demo of your team’s functionality from the main branch
The presentation should be to the appropriate audience and provide supporting visuals and flow. The presentation should be at least 10 minutes and no longer than 15.
Collaboration
This is a team deliverable. Please talk with the instructor if you have a documented health reason where you cannot complete presentations to work out an alternative.
Evaluation
When you are not presenting, you will evaluate your peers’ presentations. Additionally, any teaching staff in the room will evaluate the presentation using the following rubric (also available as a PDF). The rubric scores are scaled to the presentation’s 40 points when grading.
| Item | Excellent | Proficient | Limited |
|---|---|---|---|
| Introduction | 2 - Introduce team and project. Motivate enhancements. | 1 - Introduction of team incomplete or project enhancements not motivated. | 0 - Otherwise |
| Process Description (What you did, even if not correct) | 2 - Process is described clearly, organized logically, and reflected on (lessons learned) | 1 - Process is not clear or lacking detail | 0 - Otherwise |
| Functionality Demo | 2 - Complete live demo of functionality with a cohesive story and no major technical glitches. | 1 - Mostly complete live demo of functionality. Story may not be cohesive or there may be some technical glitches. | 0 - Otherwise |
| Visuals | 2 - All graphics and text are clearly readable | 1 - Some slides/demo are difficult to see/read | 0 - Otherwise |
| Correct Audience | 2 - Terms/process explained for audience | 1 - Some terms unclear | 0 - Otherwise |
| Presentation Flow | 2 - Presentation transitions easy to understand | 1 - Difficult to follow | 0 - Otherwise |
Each individual will also be evaluated for their speaking.
| Item | Excellent | Proficient | Limited |
|---|---|---|---|
| Contribution | 2 - Contributes to the presentation and discusses their work contribution to the project | 1 - Minimal contribution | 0 - Otherwise |
Deliver Product
You must deliver all of your bonus functionality and technical document updates by the deadline (S Nov 21 @ 11:45 pm) by merging to the main branch.
Timeframe
Final Project Delivery
- Deadline: S Nov 21 @ 11:45 pm
Audience
You are delivering the product to management for acceptance testing before delivery to the customer.
Activity
You may also deliver extra credit tasks, documented in technical-documents/extra-credit.md so the teaching staff can find and grade them. Only code merged with main will be considered when grading. Your automated JUnit tests are all expected to be high quality, passing, and to generate at least 70% line coverage and 50% branch coverage of the backend, as reported by ./mvnw verify and on the GitHub Actions run summary.
Management will evaluate your implementation with acceptance tests and through a code inspection.
Collaboration
This is a team deliverable. All team members are responsible for the content even if portions of the work are completed individually. All team members should review and provide feedback.
Evaluation
Your product will be evaluated by:
- A green GitHub Actions build on the
mainbranch, with at least 70% line and 50% branch coverage - Manager acceptance tests
- Manager code inspection
Update Technical Documents
As you implemented the new feature and fixed any bugs, you may have changed your requirements, design, system tests, and your issues. Add information to any impacted technical document to discuss the changes as part of development.
Timeframe
Final Project Delivery
- Deadline: S Nov 21 @ 11:45 pm
Audience
The change documentation is intended to report out to management and any future team that receives your project how your plan changed over the course of the project.
Activity
Each document template in technical-documents/ ends with a section for this: Changes During Development in the requirements, and Changes During Implementation in each feature design. Fill those in, and add a similar note to system-tests.md and rest-api.md if they changed. If you followed your documents without changes, say so, and reflect on how the implementation went. Make these updates on the feature branches that caused the changes, or on a docs-final document branch, and merge them to main by the final deadline.
All issues should be closed unless the issue is a bug that was found during development and not fixed.
Collaboration
This is a team deliverable. All team members are responsible for the content even if portions of the work are completed individually. All team members should review and provide feedback.
Evaluation
You will be evaluated on the updates that your provide to the document that reflects your work activity.
Technical Processes
Follow Technical Processes
As you work on the Team Project, you and your team should follow the required Technical Processes. Your use of process will be evaluated throughout the project and you can discuss your process with your TA during your team check-ins.
Timeframe
Throughout the project.
Audience
As a member of a team, you are expected to follow the required technical processes.
Activity
Follow the required technical processes.
- Following GitHub Processes
- Following Issue Processes
- Following Bug Reporting Processes
- Maintaining Green Main
- Maintaining Javadoc
Collaboration
This is a team activity.
Evaluation
You will be evaluated on following the technical processes throughout the Team Project.
Project Management
Project Management Plan Updates
Update your project management plan and tasks-final.md to show how the project finished. Make the updates on your project management branch (project-management or project-management-final), with each team member committing their own updates, and merge them by pull request to development and main by the final deadline.
Timeframe
Final Project Delivery
- Deadline: S Nov 21 @ 11:45 pm
Audience
The change documentation is intended to report out to management and any future team that receives your project how your plan changed over the course of the project.
Activity
Fill in the Changes During the Project section of project-management/index.md to discuss how your plan changed. If you followed your plan without changes, say so, and reflect on how the project went. Bring project-management/tasks-final.md up to date with actual hours and status.
Collaboration
This is a team deliverable. All team members are responsible for the content even if portions of the work are completed individually. All team members should review and provide feedback.
Evaluation
You will be evaluated on the updates that your provide to the project management plan document that reflects your work activity.
Team Collaboration
Contribution
All team members are expected to contribute to Final Project of the assignment. Make sure that you record your contribution through commits to the repository, participation in the development processes, and collaboration on the technical and project management documents. If you work with a team mate on a pair programming or review activity, please note the collaboration in GitHub.
As a member of a team, you are responsible for all team deliverables. That means you should review your teammate’s work because your name is on the submission too!
Missing contributions will lead to deductions. Overwriting or rejecting team member contributions without constructive feedback and suggestions may also lead to a deduction by impeding another’s contribution.
During lab time you are expected to be present and collaborating with your team or, if working individually, you should be working on tasks associated with CSC 326.
During lecture, you will have the opportunity to sit with your team and have a team scrum. You are expected to check in with your team during this time.
Your contributions will be assessed through analysis of your team’s GitHub repository and feedback from teammates!
Team Member Peer Evaluation
You will complete an evaluation of all of your teammates (full team evaluation). Your instructor will provide details for completing the evaluation. You will earn points for submitting an evaluation and your teammates (full team) will grade you on your participation and contribution.