Updated for Fall 2026
Iteration 1 is a two week iteration. The iteration is broken into two pieces - Iteration 1A - Design & System Test and Iteration 1B - Implementation & Test to ensure momentum and feedback.
Each feature-based team is expected to deliver at least one major piece of functionality during Iteration 1. Iteration 1A supports design and creation of system tests. Iteration 1B is for implementation and unit/system testing. Other features, maintenance, and configuration tasks may also be completed during Iteration 1.
Iteration 1A
Deadlines
- Start Date: H Oct 22
- Deadline: W Oct 28 @ 11:45 pm
Tasks
Iteration 1A consists of the following Tasks:
Technical Deliverables
Technical Processes
- Follow Technical Processes
Project Management
Team Collaboration
Peer Review
Technical Deliverables
Product Design
You will create a design document that will show your design for implementing one or more new features and how that design integrates with the existing design. Your design will include a UML class diagram and wireframes for the UI design.
Timeframe
Iteration 1A - complete by associated deadline
Audience
Your design document is intended to be an operational document for your team and a record of your design and changes for the management team.
Example
Activity
Create a design document for each feature in your team repository’s technical-documents/design/ folder. Copy feature-design-template.md to feature-short-name.md, fill it in, and link it from the Feature Designs table on the Design page (technical-documents/design/index.md). Each design document will contain static design elements, dynamic design elements, and a discussion of design decisions. The design of the REST API endpoints will be collaborative.
Work on each feature design on its own document branch, named for the iteration part and the feature, such as docs-i1a-design-orders or docs-i2a-design-pickup, and deliver it by pull request to development and main by the deadline.
The Design page also describes the architecture of the base WolfCafe system, and security.md describes its user roles, logins, and audit logging. Read both before you design; your design has to fit into them.
You will (or should) inspect your own design. You should consider the design inspection checklist when creating your design document.
Feature-based Role Designs (Individual with team review)
Static design elements will show the static aspects of the system and the relationships between those static elements.
- Backend Static Design: Backend static design will consist of a class diagram showing the backend classes, their state, and behaviors and the relationships between classes (inheritance and composition). The class diagram should show the portion of the system you plan on working with and how you plan on modifying the system. Your class diagram should include any files and methods that you plan to add, edit, or remove. If you plan to touch it, it should be in your class diagram. If you are removing something, note it under the class name, and remove all associations to the object.
- Frontend Static Design: Frontend static design will consist of wireframe(s) that show the static user interface designs for the new/updated use cases. The wireframes should show the portion of WolfCafe you plan on working with and how you plan on modifying the system. Your wireframes should include any UI elements that you plan to add, edit, or remove.
Dynamic design elements will show the dynamic flow of control aspects of the system.
- Backend Dynamic Design: Backend dynamic design will consist of a sequence diagram demonstrating the flow of control for the use cases starting from the REST API.
- Frontend Dynamic Design: Frontend dynamic design will consist of connecting the wireframes together into a flow or navigation map to understand the transitions between UI states.
Design Decisions describe the decisions that you made when creating the design for the new functionality. This is a high level overview of the changes you’re making. Describe the changes at all layers of the system. If you are not making any large changes, state why not. Describe the portions of the system that you’ll reuse and the portion of the system that will stay the same. This section should explain the pieces in your class diagram that will be touched to implement the changes, the reasons for the changes, and the limitations and constraints of the design so that a project manager can evaluate the design’s goals and functionality and so that another programmer could implement the design without additional clarification by you. You should reference the class diagram figure as appropriate.
REST API (Team)
As a team, with the frontend feature-based roles leading the discussion, design the REST API endpoints that should be added, edited, or deleted to implement the new use case. List them in the REST API section of each feature design, and record every endpoint you add, change, or remove, with the roles allowed to call it, in technical-documents/design/rest-api.md. Your team decides whether rest-api.md changes go on their own shared document branch or on the feature’s <feature>-backend branch; record that choice in your Ground Rules.
Resources
Export your diagrams and wireframes as images, commit them to an images folder next to your design document, and embed them with Markdown, for example . Do not host images anywhere else and link to them. If your diagramming tool has a text-based format (like PlantUML or UMLetino’s XML), commit that source alongside the image.
UML Editors
- Dia - Creates UML diagrams, including class diagrams.
- UMLetino - Online tool with text based properties that can be exported/imported in XML.
- PlantUML - Tool that lets you “program” UML diagrams.
- Draw.io - Online tool to draw diagrams.
- LucidChart - A commercial UML and diagramming tool that is free for students. You must use your NCSU email address to register.
Wireframe Editors
- Balsamiq for Mockups. There’s a 30 day trial for the download. One team member should use the trial at a time. There’s also a cloud version with a free trial.
- MockFlow
- Wireframe.cc
Collaboration
This is a team deliverable. All team members are responsible for the content even if portions of the work are completed individually. All team members should review and provide feedback.
Evaluation Rubric
You will be evaluated on the quality of your design document.
Product Development
You may start implementation and unit testing of your Iteration 1 feature(s). However, this is not required (but strongly encouraged that you do start a bit of implementation/testing) during Iteration 1A.
Technical Processes
Follow Technical Processes
As you work on the Team Project, you and your team should follow the required Technical Processes. Your use of process will be evaluated throughout the project and you can discuss your process with your TA during your team check-ins.
Timeframe
Throughout the project.
Audience
As a member of a team, you are expected to follow the required technical processes.
Activity
Follow the required technical processes.
- Following GitHub Processes
- Following Issue Processes
- Following Bug Reporting Processes
- Maintaining Green Main
- Maintaining Javadoc
Collaboration
This is a team activity.
Evaluation
You will be evaluated on following the technical processes throughout the Team Project.
Project Management
Project Management Plan Updates
Update your project management plan and this iteration part’s task sheet to show your progress before your team check-in with your manager. Make the updates on your project management branch, with each team member committing their own updates, and merge them by pull request to development and main by the deadline.
Team Check-in with Manager
Each week you will spend some time checking in with your manager to give a team update during lab. Make sure that you check in with your manager in lab each week!
Timeframe
Iteration 1A - complete during lab
Audience
You will report your team progress to your manager.
Activity
Check in with your manager to discuss your progress. Use your development plan to drive your discussion.
You should discuss the following with your manager:
- Your updated project management plan
- Created issues
- A summary of your requirements and requirements inspection
- A summary of your system test plan and system test plan inspection
- Your GitHub setup
- Your tasks for the upcoming week and who is assigned to each task
Collaboration
This is a team activity.
Evaluation
Your manager will provide feedback on your plan and give you feedback on where you stand. There may be deductions if you are too far off from your plan each week.
Team Collaboration
Contribution
All team members are expected to contribute to Iteration 1A of the assignment. Make sure that you record your contribution through commits to the repository, participation in the development processes, and collaboration on the technical and project management documents. If you work with a team mate on a pair programming or review activity, please note the collaboration in GitHub.
As a member of a team, you are responsible for all team deliverables. That means you should review your teammate’s work because your name is on the submission too!
Missing contributions will lead to deductions. Overwriting or rejecting team member contributions without constructive feedback and suggestions may also lead to a deduction by impeding another’s contribution.
During lab time you are expected to be present and collaborating with your team or, if working individually, you should be working on tasks associated with CSC 326.
During lecture, you will have the opportunity to sit with your team and have a team scrum. You are expected to check in with your team during this time.
Your contributions will be assessed through analysis of your team’s GitHub repository and feedback from teammates!
Weekly Teaming Reflection
Each week, you will be asked to complete a weekly teaming reflection. These will be emailed out via Qualtrics and will be due as stated in the weekly emails. The TAs will use these to help with discussions about contribution and collaboration during the team meetings. You will receive credit for completing them with good faith effort each week (please don’t rush through them).
Peer Review
Requirements and System Test Inspection
You will complete a requirements and system test inspection of your team’s requirements and system test plan. The inspection will ensure everyone understands the artifacts and identify any issues.
Timeframe
Iteration 1A - Complete during lab
Audience
You are providing feedback to the requirements team in your software company. Each feature-based subteam will inspect the other subteam’s requirements and system test plan.
Example
Activity
With your feature-based subteam, review the other feature-based subteam’s requirements and system tests.
You will create an issue named “
You will create an issue name “
Inspection Process
Review the other subteam’s requirements and system tests and identify any issues or problems that should be addressed. As you review, read the artifacts out loud. Use the requirements inspection checklist and test inspection checklist to help you with your inspection.
Collaboration
This is a team activity.
Requirements Inspection Checklist
Use the requirements inspection checklist to guide your inspection. As you read the requirements, keep the checklist items in mind. Use them to guide your feedback.
Completeness and Correctness
- Is each requirement written in clear, concise, unambiguous language?
- Do any of the requirements conflict with or duplicate other requirements?
- Is any necessary information missing from the requirement?
- Are all internal cross-references to other requirements correct?
- Are all security and safety considerations properly specified?
- Have all data privacy requirements been included?
- Do the requirements have acceptance tests?
Process
- Do the requirements provide an adequate basis for design and system test?
- Is teach requirement verifiable by testing, demonstration, review, or analysis?
Test Inspection Checklist
Use the test inspection checklist to guide your inspection. As you review the your team’s system test plan, keep the checklist items in mind. Use them to guide your feedback.
- Are the test ids or test methods unique?
- Are descriptions, repeatable, specific, and unambiguous?
- Are expected results clearly stated?
- Are preconditions defined for each test?
- Is the test behavior tied to a requirement?
- Does each test accurately verify a specific requirement?
- Does the test evaluate the right results to know that it passed?
- Do the tests sufficiently cover the requirements? Are more tests needed?
Evaluation
You will be evaluated on 1) your inspection report and 2) addressing feedback about your code and automated tests.
Inspection Report
Your team will be evaluated on the quality of your inspection report. So what happens if you didn’t find anything to comment on or only small things to comment on? In that case summarize what worked well and areas of note that you would like to highlight for management.
Addressing Inspection Report Feedback
After the inspection is complete, you should start addressing the feedback. Addressing the feedback means that 1) you may make changes to your requirements/system tests or 2) you may choose not to make changes or take the recommendation with a justification as to why.
Make the changes to your requirements and system tests on a document branch such as docs-i1a-inspection-fixes, and reference the inspection issue in each commit so the changes can be traced to the feedback.
Remember, justifications about not taking inspection feedback should be phrased professionally and try to identify a technical reason or business case about why the feedback will not be followed.
Iteration 1B
Deadlines
- Start Date: H Oct 29
- Deadline: W Nov 4 @ 11:45 pm
Tasks
Iteration 1B consists of the following Tasks:
Technical Deliverables
Technical Processes
- Follow Technical Processes
Project Management
Team Collaboration
Peer Review
- Design Inspection (in lab)
Extra Credit
Technical Deliverables
Product Development
During Iteration 1, your team will implement one or more major pieces of required functionality to meet your requirements and Iteration 1 design; unit and integration test your implementation with automated JUnit tests; and run your system tests by hand, recording the actual results.
you must deliver at least one use case corresponding to a problem statement by the end of each iteration. YOU MUST deliver completed stories from development to main in a pull request(s) by the end of iteration 1B.
Timeframe
- Iteration 1B - due W Nov 4 @ 11:45 pm
Audience
Your code and automated tests are operationalized for your team and serve as a record of your work for management.
Activity
Implement and test the functionality that meets your requirements and design you planned to deliver as part of Iteration 1.
Document updates that come with the code belong on the feature branch with it, so one pull request shows both: the actual results of the feature’s system tests in system-tests.md, endpoint changes in rest-api.md (unless your team keeps those on a shared branch), logging details in the use cases, and design corrections found while implementing. See Technical Document Branches.
Collaboration
This is a team deliverable. All team members are responsible for the content even if portions of the work are completed individually. All team members should review and provide feedback.
Evaluation
See Done Criteria for elements listed in the Problem Statement.
Technical Processes
Follow Technical Processes
As you work on the Team Project, you and your team should follow the required Technical Processes. Your use of process will be evaluated throughout the project and you can discuss your process with your TA during your team check-ins.
Timeframe
Throughout the project.
Audience
As a member of a team, you are expected to follow the required technical processes.
Activity
Follow the required technical processes.
- Following GitHub Processes
- Following Issue Processes
- Following Bug Reporting Processes
- Maintaining Green Main
- Maintaining Javadoc
Collaboration
This is a team activity.
Evaluation
You will be evaluated on following the technical processes throughout the Team Project.
Project Management
Project Management Plan Updates
Update your project management plan and this iteration part’s task sheet to show your progress before your team check-in with your manager. Make the updates on your project management branch, with each team member committing their own updates, and merge them by pull request to development and main by the deadline.
Team Check-in with Manager
Each week you will spend some time checking in with your manager to give a team update during lab. Make sure that you check in with your manager in lab each week!
Timeframe
Iteration 1B - complete during lab
Audience
You will report your team progress to your manager.
Activity
Check in with your manager to discuss your progress. Use your development plan to drive your discussion.
You should discuss the following with your manager:
- Your updated project management plan
- Created issues
- A summary of your design and design inspection
- Blockers to progress
- Your tasks for the upcoming week and who is assigned to each task
- What you plan to deliver to
mainby the end of Iteration 1
Collaboration
This is a team activity.
Evaluation
Your manager will provide feedback on your plan and give you feedback on where you stand. There may be deductions if you are too far off from your plan each week.
Team Collaboration
Contribution
All team members are expected to contribute to Iteration 1B of the assignment. Make sure that you record your contribution through commits to the repository, participation in the development processes, and collaboration on the technical and project management documents. If you work with a team mate on a pair programming or review activity, please note the collaboration in GitHub.
As a member of a team, you are responsible for all team deliverables. That means you should review your teammate’s work because your name is on the submission too!
Missing contributions will lead to deductions. Overwriting or rejecting team member contributions without constructive feedback and suggestions may also lead to a deduction by impeding another’s contribution.
During lab time you are expected to be present and collaborating with your team or, if working individually, you should be working on tasks associated with CSC 326.
During lecture, you will have the opportunity to sit with your team and have a team scrum. You are expected to check in with your team during this time.
Your contributions will be assessed through analysis of your team’s GitHub repository and feedback from teammates!
Team Member Peer Evaluation
You will complete an evaluation of all of your teammates (full team evaluation). Your instructor will provide details for completing the evaluation. You will earn points for submitting an evaluation and your teammates (full team) will grade you on your participation and contribution.
Weekly Teaming Reflection
Each week, you will be asked to complete a weekly teaming reflection. These will be emailed out via Qualtrics and will be due as stated in the weekly emails. The TAs will use these to help with discussions about contribution and collaboration during the team meetings. You will receive credit for completing them with good faith effort each week (please don’t rush through them).
Peer Review
Design Inspection
You will complete a design inspection of your team’s design. The design inspection will ensure that everyone on the team understands the artifacts and identify any issues.
Timeframe
Start of Iteration 1B - During lab
Audience
You are providing feedback about your team’s design.
Example
Activity
With your team, review your team’s design(s). You will complete an issue that will list any issues found with the design.
Design Inspection Process
Review your team’s design document and identify any problems. As you review, read the documents out loud and summarize any diagrams. Use the design inspection checklist to help you with your inspection.
Design Inspection Checklist
Use the design inspection checklist to guide your inspection. As you review the your team’s design, keep the checklist items in mind. Use them to guide your feedback.
- Can every member of the team trace scenarios of the use case through the design?
- Does the design accurately reflect the requirements?
- Can all components of the design be traced to a specific requirement?
- Do classes, methods, and attributes reflect intention-revealing naming?
- Do classes and methods reflect the principle of single responsibility?
- Does the purpose of the method match the overall responsibility of the class that it is in?
- Have the class diagrams been drawn to emphasize the classes used by a set of scenarios in a use case?
- Is flow of control obvious and correct within the diagrams?
- Does the artifact reflect an accurate interpretation of the Model-View-Controller design pattern?
- Does the artifact accurately reflect other design patterns that may be used?
- Is the visibility of methods and attributes appropriate?
- Are there any unused attributes or methods in a class?
- Does the design account for any auditing and logging concerns?
- Does the design account for any nonfunctional requirements or constraints?
- Is the implementation suggested by the design testable?
Checklist References
- Adapted from http://www.mcbreen.ab.ca/papers/QAOODesign.html
Collaboration
This is a team activity
Evaluation
You will be evaluated on 1) your design inspection report and 2) addressing any issues with the design.
Design Inspection Report
our team will be evaluated on the quality of your inspection report. So what happens if you didn’t find anything to comment on or only small things to comment on? In that case summarize what worked well and areas of note that you would like to highlight for management.
Addressing Design Inspection Report Feedback
After the inspection is complete, you should start addressing the feedback. Addressing the feedback means that 1) you may make changes to your artifact or 2) you may choose not to make changes or take the recommendation with a justification as to why.
Make the changes to your designs on a document branch named for the iteration part, such as docs-i1b-design-fixes or docs-i2b-design-fixes, and reference the inspection issue in each commit so the changes can be traced to the feedback.
Remember, justifications about not taking inspection feedback should be phrased professionally and try to identify a technical reason or business case about why the feedback will not be followed.
